ENVIRONMENTAL MANAGEMENT
Some of the programs,
plans and activities that run within the environmental management
developed by Shougang in our industrial facilities as the camp, we
have the following::
MONITORING PROGRAM AND
ENVIRONMENTAL CONTROL
Quality of Water, Air and Noise
Concerning this we look to determine the compliance degree of the
water’s quality, air and noise existing nationwide as well as the
commitments made in environmental impact studies that are approved
by the Ministry of Energy and Mines.
SOLID WASTE MANAGEMENT PLAN
Shougang Hierro Peru,
through its Department of Industrial Safety and Environment, as part
of their policies of social responsibility and environmental
protection, has developed the Waste Management Plan (WMP) for its
industrial facilities located in the port of San Nicolas and Marcona
Mine, in order to provide proper management of all waste generated
as a result of its operations, which are subject to proper
management, using appropriate technologies and strategies for this
purpose.
For this reason, Shougang Hierro Peru SAA develops a new management
structure and operation within its facility, which consists of the
implementation of a Waste Management System in which all company
members, staff members, workers and / or contractors, stating
clearly the level of involvement necessary to carry out the WMP.
In
addition, this WMP, establishes the criteria used and the procedures
to be followed by the need to eliminate SW generated inside the
industrial facilities of Shougang Hierro Peru SAA, among them we
have the presentation of management alternatives, in which include
the participation of companies providing services, (EPS-RS and
EC-RS) and waste management systems, to carry out a waste management
in which we can optimize resources and reduce the time storage of
waste within the facility, managing to improve operating conditions
and reducing health risks and workers safety.
DOMESTIC WASTEWATER TREATMEN
This project involved the construction of the " Domestic Wastewater
Camp Shougang Hierro PERU SAA", it began operations in February
2007, currently running at an optimum manner, complying with the
environmental objective to treat domestic wastewater before dumping
it to the sea, so it enters with levels of physical and chemical
parameters that are below the maximum permissible limits according
to law, ensuring an effluent quality and pollution for the waters
receiving it.
|
|
|
|